10 Tons Tyre Pyrolysis Plant In Indonesia

On October 31, 2016, BLJ – 10 tyre pyrolysis plant was shipped to Indonesia. Our workers were orderly packaging various parts of this equipment. Then our company has sent a technical staff for guiding the installation, testing the machine and training workers. Installation Video of 10 Tons Tyre Pyrolysis Plant in Indonesia:

The South African Customer Came to See Beston Continuous Pyrolysis Equipment

The South African Customer Came to See Beston Continuous Pyrolysis Equipment

On November 15, 2016, our sales manager Henry and saleswoman Bella received a customer from South Africa. The South Africa customer was very interested in Beston fully continuous pyrolysis equipment. Bella not only introduced the details of the continuous pyrolysis plant, but also provided three models for customer to reference.Eventually this customer very pleased with … Read more…

Pyrolysis Plant Was Shipped To The Netherlands

Pyrolysis Plant Was Shipped To The Netherlands

On December 18,2015,The BLJ-6 pyrolysis plant would be shipped to the Netherlands. After-sales Service: 1. Design the installation drawings according to your site. 2. 1 year warranty, engineers available to service at any time. 3. Periodical call visit, to make sure there is no problems of the equipment. 4. Design specific maintenance program according to … Read more…

Semi-Continuous Pyrolysis Plant Was Installed In Brazil

Semi-Continuous Pyrolysis Plant Was Installed In Brazil

On July 13,2015, the components of the pyrolysis plant was shipped to the installation site. Installation and Training We will send one technician for each set of machine for guiding your installation, testing the machine and training your workers. The installation period shall be one month. The following is the site installation video:

Tyre Pyrolysis Plant In Jordan

Tyre Pyrolysis Plant In Jordan

In May 2015,tyre pyrolysis plant was being installed. About the Installation and training, we will send one technician for each set of machine for guiding your installation, testing the machine and training your workers. The installation period shall be one month. The following is a site installation video: